Water Treatment
Services in
El Portal, FL
Every house in the village gets Miami-Dade County water, and nearly every one still drains to a septic tank set in ground close to the Little River's water level. Four in five homes were built before 1960. We test your tap for free, then recommend RO, carbon or a softener only where your numbers call for it.
Homes Went Up
Tap Test
Warranty
The Village of El Portal doesn't treat or sell water. Every home and business is a customer of Miami-Dade Water and Sewer (WASD), which draws from the Biscayne Aquifer, treats the supply for this area at its Hialeah and John E. Preston plants, softens it with lime and disinfects it with chloramine. That water met all federal and state standards in 2025. What sets the village apart is underground: there is no sewer system yet, so roughly 846 properties rely on septic tanks, many of them on low lots near the Little River.
El Portal covers about 0.4 square miles between 91st Street and the Little River canal, from NW 5th Avenue to NE 5th Avenue, and counted 1,986 residents in the 2020 Census. It was incorporated on December 6, 1937, and the State of Florida has designated the whole village a bird sanctuary. About nine in ten homes are detached houses, most of them lived in by their owners, so whole-house equipment usually has a spot in a garage, utility room or shaded side yard.
El Portal's Water Supplier and the Mains That Feed the Village
One utility from edge to edge. We checked Miami-Dade County's water service area map against all 50 Census blocks in the village, and every block, with all 847 homes counted in 2020, falls in WASD's area. The Village's 2017 wastewater plan says the same thing in plain terms: drinking water is bought from WASD and arrives through County mains on NE 2nd Avenue, North Miami Avenue and 87th Street. Billing, outages and water quality calls all go to WASD; the number listed for this service area is 786-552-4738.
Two plants feed this area. That plan places El Portal in WASD's Hialeah–Preston subarea. According to WASD, those plants supply homes from SW 8th Street north to the Broward line, and both draw only from the Biscayne Aquifer. At Hialeah the water gets lime treatment followed by air stripping towers. Raw water at Preston holds more natural organics, which is why that plant runs what WASD names enhanced softening, a step that also ended the yellowish color Preston water once showed.
Next door works differently. Across 91st Street, a few hundred homes in the northeast corner of Miami Shores get City of North Miami water, as our water treatment page for Miami Shores explains. No such split exists in El Portal.
What the County's 2025 Water Report Shows
PFOS, PFOA and Other PFAS
Across 2025 main-system samples, PFOS ranged 7 to 33 ppt and PFOA 3 to 13 ppt, with PFHxS at 2 to 7 and PFNA as high as 5. The combined hazard index reached 1, equal to its future cap. None of these limits apply until 2029.
Fix: Under-Sink RO6:2 FTS From the Hialeah Plant
EPA testing in 2023 and 2024 found 129 to 190 ppt of 6:2 fluorotelomer sulfonate in water leaving the Hialeah plant. It belongs to the PFAS family but has no drinking water limit, and it isn't part of the 2029 rule.
Fix: Under-Sink ROTrihalomethanes and Haloacetic Acids
TTHMs averaged 50 ppb, with samples from 9 to 59, where the limit is 80. HAA5 averaged 34 ppb (10 to 43) against a limit of 60. Both form as chloramine meets organic matter on the way through the pipes.
Fix: Whole-House CarbonChloramine at 2.5 ppm
The 2025 average was 2.5 ppm, from not detected up to 4.0, the legal ceiling. It's the flavor in a glass of tap water and the smell in a hot shower, and over the years it breaks down ordinary softener resin.
Fix: Catalytic CarbonLead and Copper
In the County's home sampling, the 90th-percentile lead result was 3.2 ppb and 1 of 102 homes exceeded the 15 ppb action level. Copper's 90th percentile was 0.07 ppm. In a 1940s or 1950s house, the pipes and fixtures past the meter decide what reaches your glass.
Fix: Lab Lead Test + ROArsenic, Radium, Chromium-6
Arsenic tested at 1 ppb (limit 10) and combined radium at 1 pCi/L (limit 5). Total chromium wasn't detected. Chromium-6 measured 0.059 to 0.074 ppb at both plants in EPA's 2015 testing; it has no federal limit of its own.
Fix: RO, If You Want LowerReducing PFAS in Your Drinking Water
We plan around the high reading. EPA's 2023–24 sampling measured 30 to 33 ppt of PFOS in water leaving the Hialeah plant and 12 to 16 ppt at Preston. Both plants feed the pipes that reach the village, and the County doesn't say which one supplies a given street on a given day, so for a home here we work from the 2025 system high of 33 ppt.
What you swallow counts most. The federal ATSDR says showering and bathing are not a significant route of PFAS exposure; drinking water and food made with it are. That puts the fix at the kitchen sink. Our reverse osmosis drinking water systems are five-stage units, NSF/ANSI certified, designed to reduce PFAS along with lead and chromium-6, with a separate faucet and an optional line to the refrigerator.
RO on a septic lot. An RO unit sends some water down the drain while its storage tank refills. For a family's drinking and cooking water that adds little to a working septic tank, but if your drain field already struggles after rain, tell us during the test and we'll plan the drain connection around it.
Septic Tanks, a High Water Table and Treatment Equipment
The whole village is on septic for now. The Village's 2017 wastewater plan counted about 846 septic tanks and found that many drain fields beside the Little River sit lower than the water in the canal. Because the lots are small and the water table is high, many owners can't get a permit for a new drain field under current rules, and residents told the Village about repeated trouble keeping their systems working.
Sewers are on the way, over years. In 2024 WASD drilled a new force main under the Little River along NW 2nd Avenue for its Connect 2 Protect septic-to-sewer program. At the July 28, 2026 Council meeting, the mayor said Miami-Dade County had taken over the village-wide conversion, called it a 10- to 12-year project and said phase maps would follow. Village Hall (305-795-7880) can tell you when your street is scheduled.
Softeners we put on septic homes. We set them to demand-initiated regeneration, so they recharge only after a set number of gallons, which sends less brine to the tank than a unit cycling on a timer. We run the drain line where a plumber can move it to the sewer lateral when your street connects. If the drain field already backs up, have it inspected before adding anything that drains to it.
Low ground floods, too. The same plan projected water levels 3 to 10 inches higher by 2037 in the first area slated for sewers. Outdoor tanks go on a raised pad, with the control valve and its power connection kept above where water has stood after storms.
Hard Water: Test Before You Buy a Softener
WASD doesn't publish a hardness number. Biscayne Aquifer water starts out rich in calcium, and lime softening at Hialeah and Preston lowers it before the water reaches your street. Still, neither the County's 2025 report nor the Village gives a figure in grains per gallon, and hardness charts you may see online for Miami addresses aren't County data.
Your faucet gives the answer. During the free test we read hardness in grains per gallon. White crust on shower glass, spotted dishes and scale in the water heater point toward a water softener sized to that reading and to how much water your household uses. A moderate result, with chlorine taste as the main complaint, usually means carbon and RO are enough.
Pipes in El Portal's 1940s and 1950s Houses
Most of the housing predates 1960. By Census Bureau estimates, 45% of village homes date from the 1950s, 19% from the 1940s and 15% from before 1940, so about four in five were standing by 1960, and only one in ten is newer than 1980. The village grew out of the Sherwood Forest, El Jardin and El Portal subdivisions, and many of those early houses still have some galvanized steel supply pipe.
Clues that the problem is inside the house. Weak pressure at one fixture, rust-colored water from a single tap, or a metallic taste only first thing in the morning all point to old supply lines in your walls. Main breaks and hydrant flushing cloud every faucet at once, and that clears after you run the cold water for a few minutes.
Lead testing is free for older homes. Look up your service line in WASD's inventory at miamidade.gov/knowyourpipes. For lead, a first-draw sample (water that sat in your pipes overnight) sent to a state-certified lab gives the answer. If lead turns up, an under-sink RO unit or an NSF-53 certified filter protects the drinking water while you plan repiping.
When the Village's Homes Were Built
Water Filtration and Softening Systems We Install
Reverse Osmosis Systems
Sits under the kitchen sink with its own faucet: five stages, NSF/ANSI certified, designed to reduce PFAS, lead and chromium-6. It can also supply the ice maker.
$1,295 installedWhole-House Carbon Filter
Catalytic carbon on the main line takes the chloramine smell out of showers and laundry and lowers byproducts at every faucet. Compare our whole-house filtration options.
$2,450 + $149 pre-filterWater Softener Installation
A Fleck or Clack control valve, 10% crosslink resin that holds up better against chloramine, and demand-initiated regeneration programmed for septic homes. Covered by a 5-year tank warranty.
From $2,879Complete 3-Stage System
Carbon at the main, a softener after it and RO at the kitchen tap, each with one job. Our water purification systems page explains why they go in that order.
From $6,199Repairs & Maintenance
We work on any brand, including the softener that came with the house. We repair control valves, replace resin and change filters and membranes.
Call for QuoteFinancing Available
Monthly payments on any system, with approval for most credit profiles, so the equipment your test calls for doesn't have to wait.
Ask Us TodayInstalled Prices for RO, Softeners and Full Systems
Softener Only
- Sized from your hardness reading
- Demand-initiated regeneration
- Guards water heaters and fixtures
- 5-year valve, 5-year tank warranty
Carbon + Softener + RO
- Catalytic carbon for the whole house
- Softener set to your reading
- Kitchen RO with its own faucet
- Designed to reduce PFAS and lead
- No pool smell in the shower
Under-Sink RO Only
- Five-stage, NSF/ANSI certified
- Our first step for PFAS
- Designed to reduce lead and chromium-6
- Replaces cases of bottled water
What Happens During Your Free Test and Install
About 20 minutes at your sink. The free water test measures hardness, chloramine, iron, pH and total dissolved solids. PFAS takes a lab, so we walk you through WASD's 2025 numbers and can point you to a certified lab if you'd like a reading from your own tap. We also note where the main line enters, where the septic tank and drain field are, and whether that spot has flooded.
Most installs take one visit. RO is under two hours of work; a single softener or carbon tank takes two to four; the full three-stage system, four to six. Plenty of owners start with RO, add carbon, and decide on a softener once they've seen a hardness number. Afterward we handle filter and membrane replacement and softener salt delivery in 33138 and 33150, and your calls reach our own office.
El Portal Subdivisions, Boundaries and ZIP Codes
Original Subdivisions
- Sherwood Forest, home of the Little River Mound
- El Jardin
- El Portal
Main Streets
- NE 2nd Avenue business corridor
- North Miami Avenue
- 87th Street, by Village Hall
- Homes along the Little River
Village Limits
- North: 91st Street and Miami Shores
- South: Little River canal and the City of Miami
- East: NE 5th Avenue
- West: NW 5th Avenue
- Southwest: West Little River
Water Treatment Service Area in El Portal
Questions We Hear From Village Homeowners
Start With a Reading From Your Own Tap
We'll measure your water, go over the County's latest results, check older plumbing, and place equipment with your septic tank, drain field and future sewer hookup in mind. For older homes, a state-certified lab can test a first-draw sample for lead.